This was an idea from TTS director Ann Lewis, after she read the guide during the approval process. Below is paraphrased from an email to the FFS team:
Consider:
adding more examples of projects that have succeeded or failed and discuss why.
emphasize the need to ensure that user-centered outcomes are defined at the start of the implementation work and meticulously carried through the whole process to delivery of the work (this can help with turnover and subcontracting)
Context: When the FFS Team revised the De-risking Guide, it kept a list of backlog items for possibly addressing in future iterations. As the project lead during close-out, I transferred that list to the Guides repo.
Point of contact on this issue
Amelia Wong
Reproduction steps (if necessary)
No response
Skills Needed
Any Human
Design
Content
Engineering
Acquisition
Product
Other
Does this need to happen in the next 2 weeks?
Yes
No
How much time do you anticipate this work taking?
A month
Acceptance Criteria
This ticket would involve:
assessing the utility of the requested content by having conversations with relevant 18F staff (starting with Product) to decide if content on this topic should be developed/added (or if an existing resource could be linked to from the DRG)
if no, you're done.
if yes, the next step is figuring out what should be said or linked to with relevant 18F staff input
if new content is needed, writing/editing content
notifying TTS Outreach of changes to see if new content requires going through GSA concurrence
going through GSA concurrence, if needed
publishing
The text was updated successfully, but these errors were encountered:
ameliaswong
changed the title
[Request]: Consider adding more detail to the De-risking Guide's section on vendor management about how to get over the finish line"
[Request]: Consider adding more detail to the De-risking Guide's section on vendor management about how to get over the finish line
Aug 29, 2024
ameliaswong
changed the title
[Request]: Consider adding more detail to the De-risking Guide's section on vendor management about how to get over the finish line
[Request]: Consider adding more detail to the De-risking Guide's section on vendor management about completing delivery
Aug 29, 2024
A description of the work
This was an idea from TTS director Ann Lewis, after she read the guide during the approval process. Below is paraphrased from an email to the FFS team:
Consider:
Context: When the FFS Team revised the De-risking Guide, it kept a list of backlog items for possibly addressing in future iterations. As the project lead during close-out, I transferred that list to the Guides repo.
Point of contact on this issue
Amelia Wong
Reproduction steps (if necessary)
No response
Skills Needed
Does this need to happen in the next 2 weeks?
How much time do you anticipate this work taking?
A month
Acceptance Criteria
This ticket would involve:
The text was updated successfully, but these errors were encountered: