This was an idea from content testing the De-risking Guide with state employees.
“The challenge in the past has been around the schedule, sprint, timeline, and user testing. Having a schedule that can change can help people understand the goal.”
An idea is to share a sample schedule of how a project schedule ended up after the fact to show how much user research happened, for example.
Could mention that you can’t rely on a rigid schedule (we make this observation earlier when talking about PO role)
Context: When the FFS Team revised the De-risking Guide, it kept a list of backlog items for possibly addressing in future iterations. As the project lead during close-out, I transferred that list to the Guides repo.
Point of contact on this issue
Amelia Wong
Reproduction steps (if necessary)
No response
Skills Needed
Any Human
Design
Content
Engineering
Acquisition
Product
Other
Does this need to happen in the next 2 weeks?
Yes
No
How much time do you anticipate this work taking?
A month
Acceptance Criteria
This ticket would involve:
assessing the utility of the requested content by having conversations with relevant 18F staff (starting with Product) to decide if content on this subject should be developed/added (or if an existing resource could be linked to from the DRG)
if no, you're done.
if yes, the next step is figuring out what should be said or linked to with relevant 18F staff input
if new content is needed, writing/editing content
notifying TTS Outreach of changes to see if new content requires going through GSA concurrence
going through GSA concurrence, if needed
publishing
The text was updated successfully, but these errors were encountered:
A description of the work
This was an idea from content testing the De-risking Guide with state employees.
“The challenge in the past has been around the schedule, sprint, timeline, and user testing. Having a schedule that can change can help people understand the goal.”
Source: https://docs.google.com/document/d/1HIMK3ocWeS6prAVHtVjXKnOl66Tb90l377I22AAMd-Q/edit
FFS team’s thoughts in 2024:
An idea is to share a sample schedule of how a project schedule ended up after the fact to show how much user research happened, for example.
Could mention that you can’t rely on a rigid schedule (we make this observation earlier when talking about PO role)
Context: When the FFS Team revised the De-risking Guide, it kept a list of backlog items for possibly addressing in future iterations. As the project lead during close-out, I transferred that list to the Guides repo.
Point of contact on this issue
Amelia Wong
Reproduction steps (if necessary)
No response
Skills Needed
Does this need to happen in the next 2 weeks?
How much time do you anticipate this work taking?
A month
Acceptance Criteria
This ticket would involve: