You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Context: When the FFS Team revised the De-risking Guide, it kept a list of backlog items for possibly addressing in future iterations. As the project lead during close-out, I transferred that list to the Guides repo.
Point of contact on this issue
Amelia Wong
Reproduction steps (if necessary)
No response
Skills Needed
Any Human
Design
Content
Engineering
Acquisition
Product
Other
Does this need to happen in the next 2 weeks?
Yes
No
How much time do you anticipate this work taking?
No response
Acceptance Criteria
This ticket would involve:
assessing the utility of the requested content by having conversations with relevant 18F staff (starting with Acq) to decide if the worksheet should be revised
if no, you're done (after recording in this ticket a reason)
if yes, the next step is figuring out what should be said or linked to with relevant 18F staff input
if new content is needed, writing/editing content
notifying TTS Outreach of changes to see if new content requires going through GSA concurrence
going through GSA concurrence, if needed
publishing
The text was updated successfully, but these errors were encountered:
A description of the work
This was an idea/resource shared by Vicki McFadden during approvals:
“GSA Service Delivery has started breaking code review and UX review into two separate things. Asking for a user research plan explicitly. See example: https://github.com/GSA/SmartPay-RFQ/blob/main/RFQ.md#621-technical-submissions”
Context: When the FFS Team revised the De-risking Guide, it kept a list of backlog items for possibly addressing in future iterations. As the project lead during close-out, I transferred that list to the Guides repo.
Point of contact on this issue
Amelia Wong
Reproduction steps (if necessary)
No response
Skills Needed
Does this need to happen in the next 2 weeks?
How much time do you anticipate this work taking?
No response
Acceptance Criteria
This ticket would involve:
The text was updated successfully, but these errors were encountered: