You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The test test/integration-stock/depots.js on line 78 that is failing because the getAMC() function does not seem to be handling the leap year correctly, because of February 29.
The calculation for the test assumes 10 days, but getAMC() apparently only uses 9, so the check values in the test are incorrect.
Fix this test and also figure out of the SQL getAMC() function needs fixing.
The text was updated successfully, but these errors were encountered:
The test
test/integration-stock/depots.js
on line 78 that is failing because the getAMC() function does not seem to be handling the leap year correctly, because of February 29.The calculation for the test assumes 10 days, but getAMC() apparently only uses 9, so the check values in the test are incorrect.
Fix this test and also figure out of the SQL
getAMC()
function needs fixing.The text was updated successfully, but these errors were encountered: