Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

[RFC 0036] Improving the RFC process #36

Merged
merged 9 commits into from
Dec 25, 2018
Binary file added rfcs/0036-review-process.png
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
236 changes: 236 additions & 0 deletions rfcs/0036-rfc-process-team-amendment.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,236 @@
---
feature: rfc-process-team-amendment
start-date: 2018-10-27
author: Robin Gloster <[email protected]>
co-authors: Graham Christensen <[email protected]>
related-issues: 1 (initial process), 24 (implementation)
---

# Summary
[summary]: #summary

This RFC proposes an RFC Steering Committee who decide on a group of RFC
shepherds for each RFC who guide the discussion to a general consensus and then
propose a motion for a "Final Comment Period" (FCP) with a disposition for
acception or rejection (see Terminology for a short definition)


# Motivation
[motivation]: #motivation

A lot of RFCs have stalled and already an [RFC has been submitted exactly on
this topic](https://github.com/NixOS/rfcs/pull/18), which ironically has not
been decided on either. This new RFC takes the above into account and tries to
expand on that to flesh out the process further. During this effort a lot of
globin marked this conversation as resolved.
Show resolved Hide resolved
inspiration has been taken from [Rust's RFC
process](https://github.com/rust-lang/rfcs#what-the-process-is) which works well
and we have adapted to our needs.


# Detailed design
[design]: #detailed-design

## Terminology

##### RFC Steering Committee
A team of people defined by _this_ RFC and stays consistent until the team
members are changed via a follow-up RFC. This committee is responsible for
forming an RFC Shepherd team from the available nominations on each RFC. This
team also names the leader of the Shepherd team. This has to happen within 1
week after the PR has been opened. Until then the Steering Committee is
responsible for guiding the discussion. In case of the Shepherding Team not
doing its work the Steering Committee shall encourage them or step in and assign
globin marked this conversation as resolved.
Show resolved Hide resolved
new Shepherds. They also are in charge of merging accepted and rejected RFCs.
Generally by these expectations they should find time to meet once a week for
about an hour.
Copy link
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

I think we should add a paragraph about how to handle replacing members of the steering committee, in case they're not able to participate in the meetings. This would, ideally, include guidelines on when to replace members: for example, if they stop showing up.

Copy link
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Agreed. We should flesh out future work to include more steering team policies beyond just how its members are decided.

globin marked this conversation as resolved.
Show resolved Hide resolved

They have no special responsibility with regard to the content of an RFC, they
can weigh in on them, the same as any other community member, but are only in
charge of:
* selecting the Shepherds unanimously
* supervising that the Shepherds are carrying out their work
* committing the final RFC

##### Shepherd Team
globin marked this conversation as resolved.
Show resolved Hide resolved
A team of 3-4 community members defined unanimously by the RFC Steering
Committee, responsible for accepting or rejecting a specific RFC. This team is
created per RFC from community members nominated in the discussion on that RFC.

This team should be people who are very familiar with the main components
touched by the RFC. The author cannot be part of the Shepherd Team. In addition,
at most half of the Shepherd Team can be part of the RFC Steering Committee.

The resposibility of the team is to guide the discussion as long as it is
constructive, new points are brought up and the RFC is iterated on and from time
to time summarise the current state of discussion. If this is the case no longer,
then the Shepherd Team shall step in with a motion for FCP.
Copy link
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Is the main decision point accept/reject the FCP motion disposition? Maybe it would be a good idea then to add that the Shepherd Team also has to unanimously decide, after studying all the points raised during the discussion, whether to recommend accepting the RFC?


##### Shepherd Leader
The Shepherd Leader is in charge of the RFC process for a specific RFC, and is
responsible for ensuring the process is followed in a timely fashion. He has no
special resposibility with regard to moving an undecided Shepherd Team to a
certain decision.

##### Final Comment Period (FCP)
A period of ten calendar days, which will be called by the Shepherd Team after
the RFC has received ample discussion and enough of the tradeoffs have been
discussed. The Shepherd Team will propose to either accept or reject the RFC
after the FCP.


## Process from Creation to Merge

*In short, to get a major change included in Nix or nixpkgs, one must
first get the RFC merged into the RFC repository as a markdown file under the
`accepted` directory. At that point the RFC is accepted and may be implemented
with the goal of eventual inclusion into Nix or nixpkgs.*

0. Have a cool idea!
1. Fill in the RFC. Put care into the details: RFCs that do not present
convincing motivation, demonstrate understanding of the impact of the design,
or are disingenuous about the drawbacks or alternatives tend to be
poorly-received. You might want to create a PR in your fork of the RFCs
repository to help you flesh it out with a few supporters or chat/video
conference with a few people involved in the topic of the RFC.
globin marked this conversation as resolved.
Show resolved Hide resolved
2. In case your RFC is a technical proposal, you might want to prepare a
prototype of your idea to firstly make yourself aware of potential pitfalls
and also help reviewers understand the RFC. Code may be able to explain some
issues in short.
3. Submit a pull request. As a pull request the RFC will receive design feedback
from the larger community, and the author should be prepared to revise it in
response.
4. For the nomination process for potential members of the RFC Shepherd Team,
that is specific to each RFC, anyone interested can either nominate another
person or themselves to be a potential member of the RFC Shepherd Team. This
shlevy marked this conversation as resolved.
Show resolved Hide resolved
can already be done when submitting the PR.
5. The RFC Steering Committee assigns a subset of the nominees to the RFC
Shepherd Team and designates a leader for it. This has to be done
unanimously.
6. Build consensus and integrate feedback. RFCs that have broad support are much
more likely to make progress than those that don't receive any comments. Feel
free to reach out to the RFC Shepherd Team leader in particular to get help
identifying stakeholders and obstacles.
7. The RFC Shepherd Team will discuss the RFC pull request, as much as possible
in the comment thread of the pull request itself. Discussion outside of the
pull request, either offline or in a video conference, that might be
preferable to get to a solution for complex issues, will be summarized on the
pull request comment thread.
8. RFCs rarely go through this process unchanged, especially as alternatives and
drawbacks are shown. You can make edits, big and small, to the RFC to clarify
or change the design, but make changes as new commits to the pull request,
and leave a comment on the pull request explaining your changes.
Specifically, do not squash or rebase commits after they are visible on the
pull request.
9. At some point, a member of the RFC Shepherd Team will propose a "motion for
final comment period" (FCP), along with a disposition for the RFC (merge or
close).
* This step is taken when enough of the tradeoffs have been discussed that
the RFC Shepherd Team is in a position to make a decision. That does not
require consensus amongst all participants in the RFC thread (which is
usually impossible). However, the argument supporting the disposition on
the RFC needs to have already been clearly articulated, and there should
not be a strong consensus against that position outside of the RFC
Shepherd Team. RFC Shepherd Team members use their best judgment in taking
this step, and the FCP itself ensures there is ample time and notification
for stakeholders to push back if it is made prematurely.
shlevy marked this conversation as resolved.
Show resolved Hide resolved
* For RFCs with lengthy discussion, the motion to FCP is usually preceded by
a summary comment trying to lay out the current state of the discussion
and major tradeoffs/points of disagreement.
* Before actually entering FCP, all members of the RFC Shepherd Team must
sign off the motion.
Copy link
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Maybe add something like:

«
If the Shepherd Committee reaches unanimous agreement that the discussion is not producing new major substantial points, but cannot reach unanimous agreement about the disposition, it is normally advised that an FCP motion of postponing the RFC due to unresolved disagreement is proposed. It can be adopted by unanimous agreement of either the Shepherd committee or the Steering Committee.
»

10. The FCP lasts ten calendar days, so that it is open for at least 5 business
days. It is also advertised widely, e.g. in NixOS Weekly and through
Discourse announcements. This way all stakeholders have a chance to lodge
any final objections before a decision is reached.
11. In most cases, the FCP period is quiet, and the RFC is either merged or
closed. However, sometimes substantial new arguments or ideas are raised,
the FCP is canceled, and the RFC goes back into development mode.
12. In case of acceptance, the RFC Steering Committee merges the PR into the
`accepted` directory. Otherwise the RFC's pull request is closed. If no
consensus can be reached on the RFC but the idea in general is accepted, it
gets closed, too. A note is added that is should be proposed again, when the
circumstances, that are stopping the discussion to come to another decision,
change.


![RFC Process](./0036-rfc-process.png)
![Review Process](./0036-review-process.png)


## The RFC life-cycle

Once an RFC is accepted the authors may implement it and submit the feature as a
pull request to the Nix or nixpkgs repo. Being accepted is not a rubber stamp,
and in particular still does not mean the feature will ultimately be merged; it
does mean that in principle all the major stakeholders have agreed to the
feature and are amenable to merging it. In general though this means that the
implementation will be merged as long as there are no substantial technical
objections to the implementation.

Furthermore, the fact that a given RFC has been accepted implies nothing about
what priority is assigned to its implementation, nor does it imply anything
about whether a Nix/nixpkgs developer has been assigned the task of implementing
the feature. While it is not necessary that the author of the RFC also write the
implementation, it is by far the most effective way to see an RFC through to
completion: authors should not expect that other project developers will take on
responsibility for implementing their accepted feature.

Minor modifications to accepted RFCs can be done in follow-up pull requests. We
strive to write each RFC in a manner that it will reflect the final design of
the feature; but the nature of the process means that we cannot expect every
merged RFC to actually reflect what the end result will be after implementation.

In general, once accepted, RFCs should not be substantially changed. Only very
minor changes should be submitted as amendments. More substantial changes should
be new RFCs, with a note added to the original RFC. Exactly what counts as a
"very minor change" is up to the RFC Shepherd Team of the RFC to be amended, to
be decided in cooperation with the RFC Steering Committee.


## Members of the RFC Steering Committee

In cooperation and discussion with Eelco Dolstra and all nominees the proposal
for the first iteration of members of the RFC Steering Committee are:

- Eelco Dolstra (edolstra, niksnut)
- Shea Levy (shlevy)
- Domen Kožar (domenkozar)
- Jörg Thalheim (Mic92)
- Robin Gloster (globin)

globin marked this conversation as resolved.
Show resolved Hide resolved

# Drawbacks
[drawbacks]: #drawbacks

If the Steering Committee were too biased, it might select a biased Shepherding
Team. We are hoping for them and believe them to commit to doing their work in
the interest of the community. Also this RFC introduces more process and
bureaucracy, and requires more meetings for some core Nix/nixpkgs contributors.
Precious time and energy will need to be devoted to discussions.

# Alternatives
[alternatives]: #alternatives

The current state, which hardly ever results in an RFC being accepted.
shlevy marked this conversation as resolved.
Show resolved Hide resolved

A possibility could also be to define owners for particular domains who have the
responsibility of deciding to accept changes in that area. An extreme example of
this case is a BDFL responsible for all final decisions. This would mirror the
model of decisions in the kernel development. Although a soft form of "code
owners" could be the base of decisions for Shepherd nominees for different RFCs,
similar to the Rust RFC model having subteams, to whom RFCs are assigned.

# Unresolved questions
[unresolved]: #unresolved-questions

None, as of now.

# Future work
[future]: #future-work

Work on auto-labeling RFCs and automation of parts of the process that either do
not need human intervention or to remind people to continue their work.

Define how the Steering Committee is picked in the future and how to replace
members thereof if they are not able to participate in the meetings, including
guidelines on when to replace members. (a timeline, not being active, etc.)
Binary file added rfcs/0036-rfc-process.png
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.