You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
After the bug from #26, I tried to simply remove all parameters by using the option "Convert expression to constants" when exporting with SimaPro. The import works properly:
but this time it's the matching with ecoinvent3.6 cut-off that seems to fail. Even though, it's supposed to be run with calling .strategies() I specifically call sp.match_database("ecoinvent3.6 cut-off", ignore_categories=True). Yet I still have unlinked exchanges:
and the unlinked processes are actual processes from ecoinvent3.6 cut-off, e.g :
Could the matching be failing because the name of the process is the "SimaPro-name" (let's call it like that), which means in the screenshot above: 'Transport, freight, lorry >32 metric ton, euro5 {RoW}| market for transport, freight, lorry >32 metric ton, EURO5 | Cut-off, U', while in ecoinvent3.6 cut-off in my AB/brightway2 the name of the process would be something like 'Transport, freight, lorry >32 metric ton, euro5'?
I'm assuming dealing with this different nomenclature is a core concept to the SimaProCSVImporter class, so I guess it must be broken somehow because of an update from SimaPro or whatnot
If needed I can provide the Excel export files.
The text was updated successfully, but these errors were encountered:
Hello again,
After the bug from #26, I tried to simply remove all parameters by using the option "Convert expression to constants" when exporting with SimaPro. The import works properly:
but this time it's the matching with ecoinvent3.6 cut-off that seems to fail. Even though, it's supposed to be run with calling .strategies() I specifically call
sp.match_database("ecoinvent3.6 cut-off", ignore_categories=True)
. Yet I still have unlinked exchanges:and the unlinked processes are actual processes from ecoinvent3.6 cut-off, e.g :
Could the matching be failing because the name of the process is the "SimaPro-name" (let's call it like that), which means in the screenshot above: 'Transport, freight, lorry >32 metric ton, euro5 {RoW}| market for transport, freight, lorry >32 metric ton, EURO5 | Cut-off, U', while in ecoinvent3.6 cut-off in my AB/brightway2 the name of the process would be something like 'Transport, freight, lorry >32 metric ton, euro5'?
I'm assuming dealing with this different nomenclature is a core concept to the SimaProCSVImporter class, so I guess it must be broken somehow because of an update from SimaPro or whatnot
If needed I can provide the Excel export files.
The text was updated successfully, but these errors were encountered: