You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository has been archived by the owner on Nov 2, 2018. It is now read-only.
In the chart, the y-axis is called "speed". That's actually the opposite, no?
Is it ms / batch (time per batch) or batch / ms (speed, throughput)?
For the first, the lower the better (less time, faster), for the second, the higher the better (quicker, less time).
The text was updated successfully, but these errors were encountered:
In the chart, the y-axis is called "speed". That's actually the opposite, no?
Is it ms / batch (time per batch) or batch / ms (speed, throughput)?
For the first, the lower the better (less time, faster), for the second, the higher the better (quicker, less time).
The text was updated successfully, but these errors were encountered: