The google
and google-beta
providers release new minor versions approximately once a week, and major versions approximately once a year. Patch releases are created on an as-needed basis for emergency bugfixes (such as if a popular resource has become unusable in a minor version). The google
and google-beta
provider versions are kept in sync.
-
Confirm that the release branches are ready and the changelogs are merged - last week's onduty should have created them.
-
Kick off the release process for TPG, substituting your remote name for the provider repo if it is not
upstream
, typicallyorigin
git pull upstream --tags
git checkout release-X.Y.Z
git tag vX.Y.Z
git push upstream vX.Y.Z
This will trigger a Github Action to run the release for the tagged commit.
-
Wait until the previous step is successful. Double-check
releases.hashicorp.com/terraform-provider-google
shows the current release. Failure often requires manual cleanup so it's better to not cause manual work on multiple builds. -
Confirm that the release notes for the published GitHub release are correct.
- The release workflow currently copies the entire changelog into the release - we need to fix this, but this is the manual update in the meantime.
-
Kick off the release process for TPGB.
git pull upstream --tags
git checkout release-X.Y.Z
git tag vX.Y.Z
git push upstream vX.Y.Z
This will trigger a Github Action to run the release for the tagged commit.
-
Wait until the previous step is successful. Double-check
releases.hashicorp.com/terraform-provider-google-beta
shows the current release. -
Confirm that the release notes for the published GitHub release are correct.
- The release workflow currently copies the entire changelog into the release - we need to fix this, but this is the manual update in the meantime.
-
After the release has been confirmed, update the CHANGELOG on
main
branch TPG & TPGB repositories with the correct headers- The newly released header will need the correct release date. ex:
## 3.18.0 (April 20, 2020)
- The top of the changelog should have the next unreleased version as a heading. ex:
## 3.19.0 (Unreleased)
- The newly released header will need the correct release date. ex:
- Open the builds from this morning for the GA and Beta providers.
- Search for "build.vcs.number" in the Parameters tab to find out what commit SHA the nightly build ran. (It will be under Actual Parameters on Agent.)
- For each repository, run the following release-cutting script, filling in values as appropriate.
# Fixed values- consider setting them in `.bash_profile` or `bashrc`
# REMOTE is the name of the primary repo's remote on your machine. Typically `upstream` or `origin`
REMOTE=upstream
# MM_REPO should point to your checked-out copy of the GoogleCloudPlatform/magic-modules repo
MM_REPO="path/to/magic-modules"
# https://docs.github.com/en/github/authenticating-to-github/creating-a-personal-access-token, no permissions
export GITHUB_TOKEN=
# Fill these in each time
# COMMIT_SHA is build.vcs.number in TeamCity
COMMIT_SHA=
RELEASE_VERSION=4.XX.0
PREVIOUS_RELEASE_VERSION=4.XX.0
COMMIT_SHA_OF_LAST_RELEASE=`git merge-base main v${PREVIOUS_RELEASE_VERSION}`
REPO_NAME=$(basename $(git rev-parse --show-toplevel))
# use [ -n "$COMMIT_SHA" ] to make sure COMMIT_SHA is set, `git checkout` is a valid command on its own
git pull $REMOTE main --tags && [ -n "$COMMIT_SHA" ] && git checkout $COMMIT_SHA && git checkout -b release-$RELEASE_VERSION && git push -u $REMOTE release-$RELEASE_VERSION
COMMIT_SHA_OF_LAST_COMMIT_IN_CURRENT_RELEASE=`git rev-list -n 1 HEAD`
go get github.com/paultyng/changelog-gen@master
changelog-gen -repo $REPO_NAME -branch main -owner hashicorp -changelog ${MM_REPO}/.ci/changelog.tmpl -releasenote ${MM_REPO}/.ci/release-note.tmpl -no-note-label "changelog: no-release-note" $COMMIT_SHA_OF_LAST_RELEASE $COMMIT_SHA_OF_LAST_COMMIT_IN_CURRENT_RELEASE
open https://github.com/hashicorp/$REPO_NAME/edit/release-$RELEASE_VERSION/CHANGELOG.md
- We want to be reasonably confident that new releases are not introducing new bugs. Go through every test failure in the nightly builds for both GA and Beta. In general, they will fall into the following categories:
- Old bugs / test failures. These are tests which have been failing consistently with the same error since prior to the previous release. Search for the test name (and/or error message and/or resource) in Issues and create an issue if none exists. Label as a bug if the underlying behavior is also broken, and as a "test failure" otherwise.
- Flakey tests. These are tests which have been failing occasionally with the same error (or set of errors) for some time. It could be an issue with the test code, an inconsistent API response, or a quota issue. Search for the test name (and/or error message and/or resource) in Issues and create an issue if none exists. If you're not sure if a test is flakey, try to get it to pass in CI / locally. Label as "test failure"
- New bugs. This is a test which you can confirm is failing due to a change in behavior that is new to this release. Revert the change on the release branch, and open an Issue to fix the bug prior to the next release. Be sure to let next week's Bug Onduty know this has happened so that they can make sure the fix is put in place (or take necessary action otherwise.)
- Update the CHANGELOG as needed
- Ask the team if you have questions about any of their changelogs
- The generated changelog will have a section at the top for PRs it doesn’t know what to do with, which is any PR without the “changelog: no-release-note” label and without a release note or with an unrecognised release note type
- Any PRs that were already released (e.g., as part of a patch release) need to be removed
- This can be done by just adding a “changelog: no-release-note” label to them
- Any style guide violations should, as a best effort and as time permits, be fixed. The usual suspects are:
- Not starting with a service
- Starting with a resource instead of a service
- Starting with a service, but including it within `` marks (this was a case of mistaken guidance telling people the wrong thing)
- Not using the past tense--a changelog is read from the perspective of a user looking for what we did in a release, and so should be written in past tense
- Not describing the change from a user’s perspective. Our user’s don’t know what “computed” means, so it’s not helpful to tell them we made a field computed in a release. A better way to phrase it is to focus on the user impact: “fixed spurious diffs in
google_compute_instance
when no description is set”.
- Double-check for semver compliance--make sure we’re not accidentally releasing breaking changes as part of a minor release, etc.
- Send the PR against the release branch to the team, allowing them to review the changelog. Ensure that you respond to comments and merge it before Friday so that the bug onduty next week is not delayed.
In general cherrypicks should only be used to fix bugs with extreme impact, similar to the qualifications for a backport. For example, if Terraform failed to work entirely, a "perma-destroy" issue (a perma-diff on a ForceNew
field), dropped resources from state inadvertently, or deleted a resource bypassing plan, a cherry-pick may be appropriate. A perma-diff alone is generally not a qualifier.
Features should generally never be cherry-picked, and should wait for the next release instead. Cherry-picking features incentivizes rushing a change in, and if we miss making an integration test run it's possible we won't catch failing tests introduced by the new feature.
Delaying a release so that it includes a change is roughly identical to a cherry-pick, and we should generally only do it for a reason we would cherry-pick.
For both google
and google-beta
as appropriate, prior to creating the changelog:
- Identify the Git SHA of the commit you intend to include
- Run
git cherry-pick {{sha}}
- Verify that the entry was added to the changelog correctly
- Run an entire integration test run on each provider that a change was cherry-picked into.
- Next week, ensure that the entry is removed from the changelog. Responsibility falls on the cherrypicker.
Given an out-of-band change to the API that causes issues for users of old TPG releases, we're able to release backports with cherry-picked changes into past major release series (1.X
, 2.X
, etc.). However, there are significant downsides to backports and we want to use them only when necessary.
- "Users using backports in N.X who wish to upgrade to the next major release series will need to upgrade to to
N+1.Y
, whereY
is the minor/patch version that the change was introduced.- Massive jumps should be safe, but we've experienced in practice that there are often minor incompatibilities that can accumulate within a release. While going from
X.Y
->X.Y+1
is almost always safe, jumping directly toX.Y+10
occasionally isn't.
- Massive jumps should be safe, but we've experienced in practice that there are often minor incompatibilities that can accumulate within a release. While going from
- Users may demand backports for issues impacting them specifically
- Backports may cause users to stay on old major release series for longer. We don't run integration tests using old versions so they may behave unexpectedly as the API changes underneath them, particularly as defaults are added/changed or new fields added to existing nested objects. Additionally users will miss out on preventative fixes, new features, etc.
Releasing a backport immediately before another major release is especially dangerous, as it may cause users to stay 2 major releases behind HEAD. As such, we should consider these criteria when cutting one:
- When was the last major release?
- ~6 months after a release is probably sufficient time for users to have upgraded, and leaves a window until our next major release.
- What is the issue? Is there a workaround?
- Failures in
Read
cause users to be completely unable to work with a resource, including verifying that their current config is stable to upgrade. - Crashes, particularly in
Read
, are even worse. They cause the provider to be unable to be used on entire configs withouttarget
.
- Failures in
- How cleanly will the backport apply?
- Resources like GKE may have drifted significantly since the last major version. If the backport behaves subtly differently than the code @ HEAD, users may have no viable alternative.
- Create a
release-X.Y.Z+1
based off the last release in the major release series. - Apply the backported commit with
git cherry-pick {{SHA}}
based off of the merged commit onmain
. - Add an appropriate changelog. Add a note including which future release includes the fix. eg:
2.20.3 is a backport release, and some changes will not appear in 3.X series releases until 3.11.0.
. - Update the upgrade guide for that release with the same note.
- When releasing a backport to
2.20.X
, replacePROTOCOL_VERSION
andPROTOCOL_VERSIONS
in/tcrelease
withPROTOCOL_VERSION=4 PROTOCOL_VERSIONS="4.0, 5.0"
(the space between 4.0, 5.0 is very important!)