You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Please understand this diagram before proceeding. It explains how to get your PR approved & merged.
Click here to see the details of Step 1, Breaking Changes review
If you are in purview of Step 1 of the diagram, follow the Breaking Changes review process. IMPORTANT! This applies even if you believe your PR was mislabeled, for any reason, including tool failure.
Click here to see the details of Step 2, ARM review
[1] See ARM review queue (for PR merge queues, see [2]).
[2] public repo merge queue, private repo merge queue (for ARM review queue, [1])
The ARM reviewer on-call engineer visits the merge queue twice a day, so the approximate ETA for merges is 12 - 24 hours.
Purpose of this PR
What's the purpose of this PR? Check the specific option that applies. This is mandatory!
New resource provider.
New API version for an existing resource provider. (If API spec is not defined in TypeSpec, the PR should have been generated using OpenAPI Hub).
Update existing version for a new feature. (This is applicable only when you are revising a private preview API version.)
Update existing version to fix OpenAPI spec quality issues in S360.
Other, please clarify:
edit this with your clarification
Due diligence checklist
To merge this PR, you must go through the following checklist and confirm you understood
and followed the instructions by checking all the boxes:
I confirm this PR is modifying Azure Resource Manager (ARM) related specifications, and not data plane related specifications.
For convenient view of the API changes made by this PR, refer to the URLs provided in the table
in the Generated ApiView comment added to this PR. You can use ApiView to show API versions diff.
Suppressing failures
If one or multiple validation error/warning suppression(s) is detected in your PR, please follow the suppressions guide to get approval.
Getting help
First, please carefully read through this PR description, from top to bottom. Please fill out the Purpose of this PR and Due diligence checklist.
To understand what you must do next to merge this PR, see the Next Steps to Merge comment. It will appear within few minutes of submitting this PR and will continue to be up-to-date with current PR state.
For guidance on fixing this PR CI check failures, see the hyperlinks provided in given failure
and https://aka.ms/ci-fix.
If the PR CI checks appear to be stuck in queued state, please add a comment with contents /azp run.
This should result in a new comment denoting a PR validation pipeline has started and the checks should be updated after few minutes.
I don't understand if you open this by mistake, or if you're a bot. In any case, closing as inapplicable. If you are not a bot, and you meant to open this issue for this project, please explain and we can reopen.
For #28023 feedback.
ARM (Control Plane) API Specification Update Pull Request
Tip
Overwhelmed by all this guidance? See the
Getting help
section at the bottom of this PR description.Note
As of January 2024 there is no PR assignee. This is expected. See https://aka.ms/azsdk/pr-arm-review.
PR review workflow diagram
Please understand this diagram before proceeding. It explains how to get your PR approved & merged.
Click here to see the details of Step 1, Breaking Changes review
If you are in purview of Step 1 of the diagram, follow the Breaking Changes review process.
IMPORTANT! This applies even if you believe your PR was mislabeled, for any reason, including tool failure.
Click here to see the details of Step 2, ARM review
See https://aka.ms/azsdk/pr-arm-review.
Click here to see the diagram footnotes
Diagram footnotes
[1] See ARM review queue (for PR merge queues, see [2]).
[2] public repo merge queue, private repo merge queue (for ARM review queue, [1])
The ARM reviewer on-call engineer visits the merge queue twice a day, so the approximate ETA for merges is 12 - 24 hours.
Purpose of this PR
What's the purpose of this PR? Check the specific option that applies. This is mandatory!
Due diligence checklist
To merge this PR, you must go through the following checklist and confirm you understood
and followed the instructions by checking all the boxes:
ARM resource provider contract and
REST guidelines (estimated time: 4 hours).
I understand this is required before I can proceed to the diagram Step 2, "ARM API changes review", for this PR.
Additional information
Viewing API changes
For convenient view of the API changes made by this PR, refer to the URLs provided in the table
in the
Generated ApiView
comment added to this PR. You can use ApiView to show API versions diff.Suppressing failures
If one or multiple validation error/warning suppression(s) is detected in your PR, please follow the
suppressions guide to get approval.
Getting help
Purpose of this PR
andDue diligence checklist
.Next Steps to Merge
comment. It will appear within few minutes of submitting this PR and will continue to be up-to-date with current PR state.and https://aka.ms/ci-fix.
queued
state, please add a comment with contents/azp run
.This should result in a new comment denoting a
PR validation pipeline
has started and the checks should be updated after few minutes.Originally posted by @cataggar in Azure/azure-rest-api-specs#28271
The text was updated successfully, but these errors were encountered: