Plan is to separate these from the "official" RT system, which we'll keep light-weight and attached to the model-level. The heavier cases here will eventually live on the app-level as a separate testing-suite. For the RT-system plan, see #95.
Hurricane Ian "Testing suite" plan
Phase 1 is set of cases without wave OBCs and is documented in #92. Phase 2 is the set of cases with wave open BCs from Ali and is documented in #96 . Once Phase 2 is closed, Phase 3 plan is as follows:
General plan for (2D) SCHISM+WW3 coupling:
Plan is to separate these from the "official" RT system, which we'll keep light-weight and attached to the model-level. The heavier cases here will eventually live on the app-level as a separate testing-suite. For the RT-system plan, see #95.
Hurricane Ian "Testing suite" plan
Phase 1 is set of cases without wave OBCs and is documented in #92. Phase 2 is the set of cases with wave open BCs from Ali and is documented in #96 . Once Phase 2 is closed, Phase 3 plan is as follows:
Phase 3: wave OBCs from global ww3 run