Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

pmdCE: Previous measure is needed in rendition #43

Open
JoachimIffland opened this issue Feb 11, 2015 · 1 comment
Open

pmdCE: Previous measure is needed in rendition #43

JoachimIffland opened this issue Feb 11, 2015 · 1 comment
Labels

Comments

@JoachimIffland
Copy link

start timestamp is in m68 @tstamp="0.5", so m68 is to be chosen as starting measure; needs to include last event of m67 and first event of m68, so the previous measure needs to be shown in rendition
(A_mov9 p153 m67 s5)

a_mov9 p153 m67 s5

@bwbohl
Copy link
Member

bwbohl commented Feb 11, 2015

I'm not sure if that is really the case...

If the regularized version of the slur states it starts in m67 the controlevent should be a child of that measure.

----- Reply message -----
Von: "JoachimIffland" [email protected]
An: "Freischuetz-Digital/proofMEIdata" [email protected]
Betreff: [proofMEIdata] pmdCE: Previous measure is needed in rendition (#43)
Datum: Mi., Feb. 11, 2015 10:17

start timestamp is in m68 @tstamp="0.5", so m68 is to be chosen as starting measure; needs to include last event of m67 and first event of m68, so the previous measure needs to be shown in rendition
(A_mov9 p153 m67 s5)

a_mov9 p153 m67 s5


Reply to this email directly or view it on GitHub:
#43

@bwbohl bwbohl added wontfix and removed bug labels Feb 13, 2015
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
Projects
None yet
Development

No branches or pull requests

2 participants