Fixed project
parameter docs for Gitlab pull request generator (#17…
#1
ci-build.yaml
on: push
changes
8s
Ensure Go modules synchronicity
23s
Lint Go code
43s
Check changes to generated code
29s
Matrix: Run end-to-end tests
Run unit tests with -race for Go packages
0s
E2E Tests - Composite result
0s
Process & analyze test artifacts
0s
Annotations
11 errors
Ensure Go modules synchronicity
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
|
Ensure Go modules synchronicity
The operation was canceled.
|
Build & cache Go code
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
|
Build & cache Go code
The operation was canceled.
|
Check changes to generated code
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
|
Check changes to generated code
The operation was canceled.
|
E2E Tests - Composite result
Process completed with exit code 1.
|
Build, test & lint UI code
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
|
Build, test & lint UI code
The operation was canceled.
|
Lint Go code
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
|
Lint Go code
The operation was canceled.
|