[RFC 0085] NixOS Release Stabilization: ZHF on master, new timeline #85

Merged
merged 13 commits into from
Apr 6, 2021
104 changes: 104 additions & 0 deletions rfcs/0085-ZHF-on-master-and-freeze-dates.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,104 @@
---
feature: nixos-freeze-dates
start-date: 2021-01-17
author: Jonathan Ringer (@jonringer)
co-authors:
related-issues: [NixOS release schedule](https://github.com/NixOS/rfcs/pull/80)
---

# Summary
[summary]: #summary

To further minimize the amount of risk going into a NixOS release, I propose
to set freeze dates regarding changes to critical packages being merged to
staging. In addition, I also propose to stabilize the release on master
instead of the release branch, thus avoiding the need to backport every pull
request, and take advantage of the stabilization that unstable normally
receives.
Copy link
Member

@Mic92 Mic92 Feb 23, 2021

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

This should also describe what this means for new packages/modules.

Copy link
Contributor Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

New packages are welcome. Changes to modules are welcome, assuming it doesn't cause regressions, and the module changes will probably need to have documentation so it's not additional work trying to curate the release notes.

I will modify the definitions section to say that "freezing" will still allow new package and module additions.


# Definitions
[definitions]: #definition

- "Freezing" a branch or package.
- Disallow breaking changes to branch or package. In SemVer terminology, disallow major version bumps.
- A release branch can be thought of being permanently "frozen" in this regard. Stable may be a better term, but it's already overloaded with a previous release branch or channel.
- "Unfreezing" a branch or package.
- Allow for breaking changes to be made to branch or package.
- "Critical packages"
- Important packages which have many dimensions of build or runtime behavior.
- Generally these will be packages which are a part of `stdenv`, or bootstrapping a system (e.g. systemd).
- Initially these will be: `stdenv.cc`,`binutils`, and `systemd` for this RFC.
- ZHF: Zero Hydra Failures
- Period in which packages are stabilized in preparation of a release.

# Motivation
[motivation]: #motivation

The motivation for putting in place freeze dates is to avoid the common practice
of forcing many, largely-untested, commits into master before branch-off. This
happened for the 20.09 release in which ~640 staging commits were pushed through in the
days leading up to the branch off (https://github.com/NixOS/nixpkgs/pull/95492,
https://github.com/NixOS/nixpkgs/pull/96280, https://github.com/NixOS/nixpkgs/pull/96437,
https://github.com/NixOS/nixpkgs/pull/97146). The last PR included a release blocker
fix (introduced in [one of the mentioned PRs](https://github.com/NixOS/nixpkgs/pull/96437))
which delayed the branch-off from 4 Sept 2020 to 7 Sept 2020, and ZHF had to
be delayed another day to get a semi-accurate hydra build status. The systemd bump
was also largely responsible delaying the release until after the scheduled release date
where basic login features in plasma [weren't restored until Oct 5th, a week after the planned release date](https://github.com/NixOS/nixpkgs/pull/99629)
and a backlog of other plasma related issues [weren't resolved until Oct 19th, almost a month after the planned release date](https://github.com/NixOS/nixpkgs/pull/101078).
This is not to discredit any individual, but demonstrate that certain packages
have many dimensions of compatibility which need a longer time to stabilize
on unstable before being included in a release.

## Core changes

Staging-next iterations will change to one week.

Updates to `staging` which will land before branch-off will be restricted to non-breaking updates, and will need to be more thoroughly tested. The below table is a more detailed timeline, it is also sanitized of events not relating to merge criteria, staging events, or ZHF.

| Weeks from Release | Events |
| --- | --- |
| -8 Weeks | Gnome, Plasma(YY.11) packaging begins |
| -6 Weeks | Freeze "critical packages" breaking updates |
| -4 Weeks | Freeze staging, allow only non-breaking updates and Desktop Manager changes |
| -3 Weeks | (Day before ZHF) merge staging-next, prep for ZHF |
| -3 Weeks | Begin ZHF on master branch |
| -3 Weeks | Strong emphasis on minimizing regressions in master PRs |
| -2 Weeks | Merge first staging-next fixes, begin second staging-next fix cycle |
| -2 Weeks | Unfreeze "critical packages" changes to staging |
| -2 Weeks | Unfreeze staging, allow for normal staging workflow, these changes will not be present in master before branch-off |
| -2 Weeks | `staging-next` remains fixes only, will be merged before branch-off |
| -1 Weeks | Merge second staging-next fix cycle |
| -1 Weeks | Perform Branch-off, create release channels, create new beta / unstable tags |
| -1 Weeks | ZHF transitions to "backporting" workflow |
| -1 Weeks | Prepare for release, finish remaining issues |
| 0 Weeks | Release! |
| 0 Weeks | ZHF Ends |

Actual release schedule may adjust dates slightly due to unforeseen events.

Release team will retain the right to refine what constitutes "critical packages", as this may
change over time, and will likely not warrant an RFC to caputre changes.

# Drawbacks
[drawbacks]: #drawbacks

Normal staging development is disrupted for two weeks. (1 normal iteration)
Changes to "critical packages" may have to wait for a month to be merged into staging.
Master development will be uninterrupted, assuming all changes don't introduce new regressions.

# Alternatives
[alternatives]: #alternatives

## Maintain the status quo regarding release dates

Continue with cramming staging changes right before branch-off, keeping
a significant amount of stabilization work and risk before a release, and likely
continuing the trend of delayed releases.
Mic92 marked this conversation as resolved.
Show resolved Hide resolved

# Future work
[future]: #future-work

- Update [release wiki to reflect changes](https://github.com/NixOS/release-wiki)
- Inform community about changes (Discourse).