Cherry pick 0.33.2 release notes (#2038) #6875
ci.yml
on: push
Run code quality checks
1m 51s
Build documentation
2m 8s
Matrix: unit-tests
Submit code coverage metrics
6s
Matrix: integration-tests
Annotations
4 errors
Run integration tests - ibm-quantum-production
Canceling since a higher priority waiting request for 'ci-refs/heads/main' exists
|
Run integration tests - ibm-quantum-production
The operation was canceled.
|
Run integration tests - ibm-cloud-production
Canceling since a higher priority waiting request for 'ci-refs/heads/main' exists
|
Run integration tests - ibm-cloud-production
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
html_docs
|
1.59 MB |
|