This project has been restarted, so these screenshots are no longer accurate. The current state of the build is now in this repo. See BuildTheEarth-Manual-Install and BuildTheEarth YouTube tutorials if you'd like to contribute.
Block zero was placed in the 250/11 intersection. The rail bridge was built as well as the Dominion plant and the Junction gas station.
The Mill Street building, Stonewall Jackson Hotel garage, and walls for the hotel went up. A temporary entrance is shown.
The parking garage and all surrounding buildings were built. The Amtrak station and track were connected to the 250/11 bridge. Lots of sidewalks and road lane improvements.
Walls went up for many blocks and sidewalks installed. Multiple alleyways were made and tens of buildings.
Tons more buildings, sidewalks, terraforming, and general tweaks were made.