Skip to content

Commit

Permalink
Phase 1 documents (#143)
Browse files Browse the repository at this point in the history
* Phase 1 documents

* Added secret project
  • Loading branch information
gsproston-scottlogic authored Aug 15, 2023
1 parent d902b9a commit 7a5b2f8
Show file tree
Hide file tree
Showing 4 changed files with 44 additions and 0 deletions.
11 changes: 11 additions & 0 deletions backend/resources/documents/phase_1/projects/Crimson.txt
Original file line number Diff line number Diff line change
@@ -0,0 +1,11 @@
Project Crimson

Brief: New data pipeline for energy company dealing with billing and payments. Tech stack includes Java, Spark, Kafka.

Estimated cost: £650000

Time scale: January 2024-2026

Assigned: Karen,Sally,Susan

Product owner: Jane
11 changes: 11 additions & 0 deletions backend/resources/documents/phase_1/projects/Pearl.txt
Original file line number Diff line number Diff line change
@@ -0,0 +1,11 @@
Project Pearl

Brief: Design and construction of electric drills capable of drilling through bank vaults.

Estimated cost: £1500000

Time scale: April 2024-2027

Assigned: Gail,Roy,Ken

Product owner: Carrie
11 changes: 11 additions & 0 deletions backend/resources/documents/phase_1/projects/Satin.txt
Original file line number Diff line number Diff line change
@@ -0,0 +1,11 @@
Project Satin

Brief: Build a new website for a fintech startup. Tech stack is React frontend and Typescript backend.

Estimated cost: £15000

Time scale: December 2023 - August 2024

Assigned: Sally, Kevin

Product owner: Sally
11 changes: 11 additions & 0 deletions backend/resources/documents/phase_1/projects/Zebra.txt
Original file line number Diff line number Diff line change
@@ -0,0 +1,11 @@
Project Zebra

Brief: Build a new payment system for a online banking start up. Tech stack is Java, Springboot backend with React frontend.

Estimated cost: £25000

Time scale: September 2023 - August 2024

Assigned: Bob, Karen, Kevin

Product owner: Bob

0 comments on commit 7a5b2f8

Please sign in to comment.