Add ability to disable a running DAG only after after it's in a finished state #22006
Comments
Good idea. Would you like to work on maybe ? this is the best way to make sure it happens :) |
I wonder if this should be added as a configuration for pausing/unpausing DAGs? Having a separate button for this could be confusing. |
The use case as described is "Don't schedule new runs but let the current running dags to finish" - This sounds more like a scheduler feature rather than UI. |
Very much so @eladkal |
As a user, I'd like to have functionality in the UI that allows me to either "disable and stop the DAG immediately", or "disable DAG once finished". How to implement such a feature in the UI, such that it's not confusing is of course up for discussion - button, switch, etc. Also, @potiuk - I can try to pick this task up in a couple of weeks. Let's leave it unassigned for now, and I can let you know once I am ready to pick it up. |
Sure! |
I think this involves some changes to the DB schema as probably it means that |
This is why I am partial to it being a config for the scheduler because then we can't represent |
Maybe a chance to solve the "Activated" "Paused" conundrum: #14459 |
I am happy to check this out @eladkal @potiuk , OPTION(1): OPTION(2): Happy to hear out other suggestions. |
Exploring Option(2) |
Instead of messing with the state, I wonder if we could have an advanced version of the dag pause action. That will pause a dag after the end of the run. We already have a toggle in the manual DAG trigger to unpause as part of triggering a run. |
We need to be backward compatible but this functionality feel less about the dag code. I don't think it should be set on the code level... Pause/un-pause are action you take on the dag regardless of it's code. |
yes @eladkal , But, I thinks its better if we only do this when users wants it (when setting drain_on_pause=True ) , Technical Details
|
I am OK with having some code settings that can help limit the pausing options on specific dag (should DAG author wants it) but as a general concept I don't think it should be government by code (DAG author code). Today you can pause/unpause at will. We should have the same thing with the new option. Effectively this means that the UI toggle should be changed from 2 mode (paused, unpaused) to 3 mode (paused, unpaused, drain tasks -> paused) where drain eventually is switched to paused when the drain is completeled. WDYT? |
OPTION 1-We can change type of paused from Boolean to String, but this will also change behaviour of is_paused_upon_creation, OPTION 2 -Adding another check or UI element and bind with drain_on_pause, so users can handle it from UI as well. Any thoughts? |
I prefer option 1. |
I feel linke when going into details of database, DAG model, REST API, CLI... UI Experience this is a very complex thing. I agree that this option is useful. I'd propose to have a global config which changes the behavior. Either the on/of is just draining DAGs (means: Do not start new DAG runs, still schedule all tasks irrespective of DAG state) or stop scheduling tasks and DAGs. I don't see a strong use case that in a single setup both use cases have a hard requirement to be supported in parallel. |
@jscheffl The way I imagine it is that the drain status is temporary (for the duration of the drain). once drain is finished it should be switched to pause. So at any given time the amount of tasks that are in this unique state should be relatively small |
I have an alternative solution; someone with a deeper knowledge of the code base can evaluate it: |
I agree with @jscheffl here that this use case doesn't warrant adding a new state with paused/unpaused/drain for DAGs as it will complicate and slow down scheduling (and rescheduling) logic. We could do this as UI-only feature, but I am personally not convinced that we need to handle this edge case. If we really really need to, I think it is better to provide single and consistent behaviour for pausing DAGs, which considers drainage, unlike today.
@SangwanP - the use case that you started with was primarily focused on version upgrades and in that scenario, you only need this at the environment level, not at a DAG level. Moreover, in my experience, if you're doing an in-place version upgrade, any tasks that are scheduled, but not yet finished will be run again once version is upgraded. I don't think it is required for you to set all schedules to none and re-set them. |
@eladkal what do we think?
|
I'll refer to my earlier comment The use case as described is "Don't schedule new runs but let the current running dags to finish" - This sounds more like a scheduler feature rather than UI. I am very happy to proceed with what was suggested. We can always improve further according to users feedback |
Also @eladkal please assign this to me. |
Description
I'd like the ability to "drain" a DAG from the UI. This would mean:
Use case/motivation
Currently, if you disable a DAG, it stops the DAG midway - the running tasks are completed, and queued tasks remain on the queue. I would like a way to disable the DAG, but if there is an active Dag Run it should continue running until it reaches a finished state.
For us, this would be especially helpful when upgrading our Airflow images/environments. To my understanding, Airflow doesn't have a failure-free zero-downtime upgrade (please point me to documentation if its possible). When upgrading, we don't want to fail/kill running DAGs, so we let them reach a finished state. Once none of the DAGs are in a running state, we perform the upgrades. Precisely timing the DAG disable operation such that a subsequent run doesn't start, is not a practical/viable solution.
For upgrades in the past, we have changed all the DAG schedules to None, which allows a running DAG to complete but doesn't start a subsequent run. Once upgrades are done, we update the DAG schedules back to their original value.
We would like to move away from this solution, and have some built-in functionality to deal with such a case.