Skip to content

#30192 adding the date range parsing #1406

#30192 adding the date range parsing

#30192 adding the date range parsing #1406

Triggered via pull request October 1, 2024 22:12
Status Cancelled
Total duration 10m 7s
Artifacts 2

cicd_1-pr.yml

on: pull_request
Initialize  /  Initialize
2s
Initialize / Initialize
Initialize  /  Check Previous Build
4s
Initialize / Check Previous Build
Initialize  /  Check Changed Files
19s
Initialize / Check Changed Files
PR Build  /  Initial Artifact Build
8m 41s
PR Build / Initial Artifact Build
Matrix: PR Test / linux-e2e-tests
Waiting for pending jobs
Matrix: PR Test / linux-integration-tests
Waiting for pending jobs
Matrix: PR Test / linux-postman-tests
Waiting for pending jobs
PR SonarQube  /  SonarQube Scan
PR SonarQube / SonarQube Scan
PR Test  /  CLI Tests
PR Test / CLI Tests
PR Test  /  Frontend Unit Tests
PR Test / Frontend Unit Tests
PR Test  /  linux-jvm-tests
PR Test / linux-jvm-tests
Finalize  /  Prepare Report Data
6s
Finalize / Prepare Report Data
Finalize  /  Final Status
0s
Finalize / Final Status
PR Notifier  /  Resolve Message
0s
PR Notifier / Resolve Message
PR Notifier  /  ...  /  slack-channel-resolver
3s
PR Notifier / Resolve Slack Channel / slack-channel-resolver
Matrix: PR Notifier / pr-notifier
Fit to window
Zoom out
Zoom in

Annotations

2 errors
PR Build / Initial Artifact Build
Canceling since a higher priority waiting request for '-1 PR Check-30208' exists
Finalize / Final Status
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
build-reports-Initial Artifact Build
12.3 KB
workflow-data
513 Bytes