Skip to content

upgrade to go 1.23 #1389

upgrade to go 1.23

upgrade to go 1.23 #1389

Triggered via pull request November 4, 2024 09:22
@lhy1024lhy1024
synchronize #44
upgrade-mod
Status Failure
Total duration 1m 32s
Artifacts

pd-tests.yaml

on: pull_request
Matrix: chunks
report-coverage
0s
report-coverage
Fit to window
Zoom out
Zoom in

Annotations

19 errors
chunks (10)
Process completed with exit code 2.
chunks (4)
The job was canceled because "_10" failed.
chunks (4)
The operation was canceled.
chunks (1)
The job was canceled because "_10" failed.
chunks (1)
The operation was canceled.
chunks (5)
The job was canceled because "_10" failed.
chunks (5)
The operation was canceled.
chunks (9)
The job was canceled because "_10" failed.
chunks (9)
The operation was canceled.
chunks (3)
The job was canceled because "_10" failed.
chunks (3)
The operation was canceled.
chunks (7)
The job was canceled because "_10" failed.
chunks (7)
The operation was canceled.
chunks (2)
The job was canceled because "_10" failed.
chunks (2)
The operation was canceled.
chunks (8)
The job was canceled because "_10" failed.
chunks (8)
The operation was canceled.
chunks (6)
The job was canceled because "_10" failed.
chunks (6)
The operation was canceled.