CI #47
ci.yml
on: schedule
pre-commit
/
pre-commit
16s
pre-commit
/
lint-extension
1m 59s
Matrix: test-conda / test-conda
Matrix: test-pip / test-pip
Matrix: test-unit-functional-integration / test-pip
build
/
build
Annotations
7 errors and 1 notice
test-pip / test-pip (3.x, --pre --upgrade --upgrade-strategy eager)
Process completed with exit code 1.
|
test-pip / test-pip (3.x)
The operation was canceled.
|
test-pip / test-pip (3.12, ~=3.0)
The operation was canceled.
|
test-pip / test-pip (3.x, ~=2.0)
The job was canceled because "_3_x_--pre_--upgrade_--up" failed.
|
test-pip / test-pip (3.x, ~=2.0)
The operation was canceled.
|
test-pip / test-pip (3.x, true)
The job was canceled because "_3_x_--pre_--upgrade_--up" failed.
|
test-pip / test-pip (3.x, true)
The operation was canceled.
|
🎭 Playwright Run Summary
10 passed (1.3m)
|