Skip to content
Triggered via schedule January 11, 2024 11:07
Status Failure
Total duration 21m 11s
Artifacts

ci.yml

on: schedule
pre-commit  /  pre-commit
16s
pre-commit / pre-commit
pre-commit  /  lint-extension
1m 59s
pre-commit / lint-extension
Matrix: test-conda / test-conda
Matrix: test-pip / test-pip
Matrix: test-unit-functional-integration / test-pip
build  /  build
build / build
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 notice
test-pip / test-pip (3.x, --pre --upgrade --upgrade-strategy eager)
Process completed with exit code 1.
test-pip / test-pip (3.x)
The operation was canceled.
test-pip / test-pip (3.12, ~=3.0)
The operation was canceled.
test-pip / test-pip (3.x, ~=2.0)
The job was canceled because "_3_x_--pre_--upgrade_--up" failed.
test-pip / test-pip (3.x, ~=2.0)
The operation was canceled.
test-pip / test-pip (3.x, true)
The job was canceled because "_3_x_--pre_--upgrade_--up" failed.
test-pip / test-pip (3.x, true)
The operation was canceled.
🎭 Playwright Run Summary
10 passed (1.3m)