Skip to content

Merge pull request #7 from nih-fmrif/ohbm2024 #103

Merge pull request #7 from nih-fmrif/ohbm2024

Merge pull request #7 from nih-fmrif/ohbm2024 #103

Triggered via push December 8, 2023 18:08
Status Failure
Total duration 1m 41s
Artifacts 2

test.yml

on: push
Datalad install and get
35s
Datalad install and get
build
31s
build
Matrix: test-package
publish
0s
publish
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test-package (wheel)
Process completed with exit code 1.
test-package (archive)
The job was canceled because "wheel" failed.
test-package (archive)
Process completed with exit code 1.
test-package (sdist)
The job was canceled because "wheel" failed.
test-package (sdist)
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
archive Expired
5.77 MB
dist Expired
11.3 MB