Skip to content

chore(ci): Add concurrency groups to cancel redundant CI builds #1274

chore(ci): Add concurrency groups to cancel redundant CI builds

chore(ci): Add concurrency groups to cancel redundant CI builds #1274

Triggered via push May 30, 2024 00:56
Status Cancelled
Total duration 22m 34s
Artifacts

testslurm.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (3.11.5)
The hosted runner encountered an error while running your job. (Error Type: Failure).
build (3.10.9)
The hosted runner encountered an error while running your job. (Error Type: Failure).
build (3.9.16)
Canceling since a higher priority waiting request for 'SLURM-refs/heads/master' exists
build (3.9.16)
The operation was canceled.
build (3.8.16)
Canceling since a higher priority waiting request for 'SLURM-refs/heads/master' exists
build (3.8.16)
The operation was canceled.