Skip to content

chore(deps): update dependency node to v20 #2791

chore(deps): update dependency node to v20

chore(deps): update dependency node to v20 #2791

Triggered via push August 21, 2024 19:14
Status Failure
Total duration 20s
Artifacts

verify-node.yml

on: push
Matrix: Verify linux
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Verify linux (18.x)
Process completed with exit code 1.
Verify linux (20.x)
The job was canceled because "_18_x" failed.
Verify linux (20.x)
Process completed with exit code 1.
Verify linux (22.x)
The job was canceled because "_18_x" failed.
Verify linux (22.x)
The operation was canceled.