Skip to content

chore(deps): update dependency node to v18.20.4 #2754

chore(deps): update dependency node to v18.20.4

chore(deps): update dependency node to v18.20.4 #2754

Triggered via push July 8, 2024 21:48
Status Failure
Total duration 28s
Artifacts

verify-node.yml

on: push
Matrix: Verify linux
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Verify linux (18.x)
Process completed with exit code 1.
Verify linux (22.x)
The job was canceled because "_18_x" failed.
Verify linux (22.x)
The operation was canceled.
Verify linux (20.x)
The job was canceled because "_18_x" failed.
Verify linux (20.x)
The operation was canceled.