Pre-emptively cull unsatisfiable interpreter constraints. #2995
Triggered via pull request
September 19, 2024 18:46
Status
Failure
Total duration
13m 53s
Artifacts
–
ci.yml
on: pull_request
Check GitHub Organization
0s
Matrix: linux-tests
Matrix: mac-tests
tox -e format-check,lint-check,typecheck,vendor-check,package,docs
8m 35s
Gather Final Status
0s
Annotations
35 errors
./dtox.sh -e py27-pip20
Process completed with exit code 1.
|
./dtox.sh -e pypy310-pip24_2-integration --shard 1/2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py313-pip24_2-integration --shard 2/2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py313-pip24_2-integration --shard 2/2
The operation was canceled.
|
./dtox.sh -e py27-pip20-integration
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py27-pip20-integration
The operation was canceled.
|
./dtox.sh -e pypy310-pip24_2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e pypy310-pip24_2
The operation was canceled.
|
./dtox.sh -e py313-pip24_2-integration --shard 1/2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py313-pip24_2-integration --shard 1/2
The operation was canceled.
|
./dtox.sh -e pypy310-pip24_2-integration --shard 2/2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e pypy310-pip24_2-integration --shard 2/2
The operation was canceled.
|
./dtox.sh -e py37-pip22_3_1-integration --shard 2/2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py37-pip22_3_1-integration --shard 2/2
The operation was canceled.
|
./dtox.sh -e py311-pip23_3_2-integration --shard 2/2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py311-pip23_3_2-integration --shard 2/2
The operation was canceled.
|
./dtox.sh -e py37-pip22_3_1-integration --shard 1/2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py37-pip22_3_1-integration --shard 1/2
The operation was canceled.
|
./dtox.sh -e py312-pip24_2-integration --shard 2/2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py312-pip24_2-integration --shard 2/2
The operation was canceled.
|
./dtox.sh -e py312-pip24_2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py312-pip24_2
The operation was canceled.
|
./dtox.sh -e py37-pip22_3_1
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py37-pip22_3_1
The operation was canceled.
|
./dtox.sh -e py313-pip24_2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py313-pip24_2
The operation was canceled.
|
./dtox.sh -e py312-pip24_2-integration --shard 1/2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py312-pip24_2-integration --shard 1/2
The operation was canceled.
|
./dtox.sh -e py311-pip23_3_2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py311-pip23_3_2
The operation was canceled.
|
./dtox.sh -e py311-pip23_3_2-integration --shard 1/2
The job was canceled because "py27-pip20" failed.
|
./dtox.sh -e py311-pip23_3_2-integration --shard 1/2
The operation was canceled.
|
tox -e py312-pip24_2
Process completed with exit code 1.
|
tox -e py312-pip24_2-integration --shard 2/2
The job was canceled because "_3_12_py312-pip24_2_pytho" failed.
|
tox -e py312-pip24_2-integration --shard 1/2
The job was canceled because "_3_12_py312-pip24_2_pytho" failed.
|