Skip to content

fix: refactored contracts (#234) #1376

fix: refactored contracts (#234)

fix: refactored contracts (#234) #1376

Triggered via push July 15, 2024 14:15
Status Failure
Total duration 3h 12m 43s
Artifacts

ci.yml

on: push
Matrix: Test and Build Contracts Scripts
Check Commit Message
32s
Check Commit Message
Test and Build Go Modules
5m 19s
Test and Build Go Modules
Foundry Checks and Reports
12m 14s
Foundry Checks and Reports
infrastructure  /  Setup and Test Nomad Cluster
3h 0m
infrastructure / Setup and Test Nomad Cluster
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 3 warnings
infrastructure / Setup and Test Nomad Cluster
The job running on runner GitHub Actions 47 has exceeded the maximum execution time of 180 minutes.
infrastructure / Setup and Test Nomad Cluster
The operation was canceled.
Test and Build Go Modules
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Test and Build Go Modules
No github_token supplied, API requests will be subject to stricter rate limiting
infrastructure / Setup and Test Nomad Cluster
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2