Skip to content

Integration Tests #8874

Integration Tests

Integration Tests #8874

Triggered via pull request October 2, 2024 16:12
Status Failure
Total duration 6m 47s
Billable time 11m
Artifacts

integration-tests.yml

on: pull_request
Matrix: build-lint-integration-tests
Build Test Image
0s
Build Test Image
ETH Smoke Tests
8s
ETH Smoke Tests
Clean up integration environment deployments
42s
Clean up integration environment deployments
ETH Smoke Tests Go Mod Cache
0s
ETH Smoke Tests Go Mod Cache
Show Chainlink Node Go Coverage
15s
Show Chainlink Node Go Coverage
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
Build and Lint integration-tests
Process completed with exit code 1.
Build and Lint load
The job was canceled because "integration-tests_e2e___i" failed.
ETH Smoke Tests
Process completed with exit code 1.
Build Chainlink Image (plugins)
Di Received non 200 status code. StatusCode: 403 StatusMessage: Forbidden Body: <html> <head><title>403 Forbidden</title></head> <body> <center><h1>403 Forbidden</h1></center> </body> </html>