Skip to content

[GWYNETH] xcalloptions sync with revm expectation #233

[GWYNETH] xcalloptions sync with revm expectation

[GWYNETH] xcalloptions sync with revm expectation #233

Triggered via pull request October 9, 2024 16:29
Status Failure
Total duration 5m 31s
Artifacts

unit.yml

on: pull_request
Matrix: doc
Matrix: test
Ethereum state tests
4m 16s
Ethereum state tests
unit success
2s
unit success
Fit to window
Zoom out
Zoom in

Annotations

12 errors and 2 warnings
test / optimism (1/2)
Process completed with exit code 101.
Ethereum state tests
Process completed with exit code 101.
test / optimism (2/2)
The job was canceled because "_1_optimism" failed.
test / optimism (2/2)
Process completed with exit code 101.
doc tests (optimism)
Process completed with exit code 101.
test / ethereum (1/2)
The job was canceled because "_1_optimism" failed.
test / ethereum (1/2)
The operation was canceled.
test / ethereum (2/2)
The job was canceled because "_1_optimism" failed.
test / ethereum (2/2)
The operation was canceled.
doc tests (ethereum)
The job was canceled because "optimism" failed.
doc tests (ethereum)
The operation was canceled.
unit success
Process completed with exit code 1.
test / ethereum (1/2)
Failed to save: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 1
test / ethereum (2/2)
Failed to save: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 1