Skip to content

[GWYNETH] xcalloptions sync with revm expectation #233

[GWYNETH] xcalloptions sync with revm expectation

[GWYNETH] xcalloptions sync with revm expectation #233

Triggered via pull request October 9, 2024 16:29
Status Failure
Total duration 5m 14s
Artifacts

integration.yml

on: pull_request
Matrix: test
integration success
1s
integration success
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 1 warning
test / optimism
Process completed with exit code 101.
test / ethereum
The job was canceled because "optimism" failed.
test / ethereum
The operation was canceled.
integration success
Process completed with exit code 1.
test / ethereum
Failed to save: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 1