rustls #94
build.yml
on: schedule
MSRV
2m 35s
Features
1m 42s
BoGo test suite
1m 56s
Smoke-test fuzzing targets
3m 13s
Run benchmarks
16m 58s
Check for documentation errors
1m 55s
Measure coverage
3m 55s
Check minimum versions of direct dependencies
35s
Check cross compilation targets
1m 30s
Check semver compatibility
3m 28s
Format
13s
Format (unstable)
13s
Clippy
1m 6s
Clippy (Nightly)
2m 40s
Validate external types appearing in public API
1m 13s
Run openssl-tests
1m 13s
Matrix: Build+test
Annotations
18 errors and 1 warning
Format
Process completed with exit code 1.
|
Format (unstable)
Process completed with exit code 1.
|
Format (unstable)
Process completed with exit code 1.
|
Format (unstable)
Process completed with exit code 1.
|
Clippy
Process completed with exit code 101.
|
Run openssl-tests
Process completed with exit code 101.
|
Features
Process completed with exit code 101.
|
BoGo test suite
Process completed with exit code 1.
|
Build+test (stable, macos-latest)
Process completed with exit code 101.
|
Build+test (stable, windows-latest)
The job was canceled because "stable_macos-latest" failed.
|
Build+test (stable, windows-latest)
The operation was canceled.
|
Measure coverage
Process completed with exit code 101.
|
Build+test (nightly, ubuntu-latest)
The job was canceled because "stable_macos-latest" failed.
|
Build+test (nightly, ubuntu-latest)
The operation was canceled.
|
Build+test (stable, ubuntu-latest)
The job was canceled because "stable_macos-latest" failed.
|
Build+test (stable, ubuntu-latest)
The operation was canceled.
|
Build+test (beta, ubuntu-latest)
The job was canceled because "stable_macos-latest" failed.
|
Build+test (beta, ubuntu-latest)
The operation was canceled.
|
Build+test (stable, macos-latest)
Restore cache failed: Dependencies file is not found in /Users/runner/work/rustls-pow/rustls-pow. Supported file pattern: go.sum
|