Skip to content

Merge pull request #4655 from typelevel/update/sbt-1.10.2 #2801

Merge pull request #4655 from typelevel/update/sbt-1.10.2

Merge pull request #4655 from typelevel/update/sbt-1.10.2 #2801

You are viewing an older attempt in the history of this workflow run. View latest attempt.
Triggered via push September 16, 2024 01:04
Status Failure
Total duration 10m 49s
Artifacts

ci.yml

on: push
Matrix: Build and Test
Matrix: Submit Dependencies
Matrix: Scalafix
Matrix: Generate Site
Matrix: Validate Steward Config
Matrix: Publish Artifacts
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Build and Test (ubuntu-latest, 2.12, temurin@8, catsNative)
Process completed with exit code 1.
Build and Test (ubuntu-latest, 3, temurin@8, catsNative)
The job was canceled because "ubuntu-latest_2_12_temuri" failed.
Build and Test (ubuntu-latest, 3, temurin@8, catsNative)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13, temurin@8, catsNative)
The job was canceled because "ubuntu-latest_2_12_temuri" failed.
Build and Test (ubuntu-latest, 2.13, temurin@8, catsNative)
The operation was canceled.