Skip to content

test update, move statement generation to util.reaction #998

test update, move statement generation to util.reaction

test update, move statement generation to util.reaction #998

Triggered via push July 28, 2023 18:01
Status Failure
Total duration 3m 23s
Artifacts 1

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (test-postgres-12)
Process completed with exit code 2.
test (test-postgres-13)
The job was canceled because "test-postgres-12" failed.
test (test-postgres-13)
The operation was canceled.
test (test-postgres-14)
The job was canceled because "test-postgres-12" failed.
test (test-postgres-14)
The operation was canceled.
test (test-postgres-15)
The job was canceled because "test-postgres-12" failed.
test (test-postgres-15)
The operation was canceled.
test (test-postgres-11)
The job was canceled because "test-postgres-12" failed.
test (test-postgres-11)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
2fb9a91a93839023f44ab3690e4b38525789f3ee-nvd-report Expired
1.53 MB