Skip to content

Merge pull request #3250 from nf-core/renovate/astral-sh-ruff-pre-com… #9243

Merge pull request #3250 from nf-core/renovate/astral-sh-ruff-pre-com…

Merge pull request #3250 from nf-core/renovate/astral-sh-ruff-pre-com… #9243

Triggered via push October 24, 2024 16:40
Status Cancelled
Total duration 36s
Artifacts
Matrix: MakeTestWorkflow
Fit to window
Zoom out
Zoom in

Annotations

4 errors
MakeTestWorkflow (24.04.2)
Canceling since a higher priority waiting request for 'Create a pipeline and run nf-core linting-refs/heads/dev' exists
MakeTestWorkflow (24.04.2)
The operation was canceled.
MakeTestWorkflow (latest-everything)
Canceling since a higher priority waiting request for 'Create a pipeline and run nf-core linting-refs/heads/dev' exists
MakeTestWorkflow (latest-everything)
The operation was canceled.